The curing compound calculator gives the volume of compound, the number of containers, the total volume purchased and the wet film thickness for the membrane curing of a concrete slab, from the area, the coverage rate, the number of coats and the waste allowance.
How the calculation works
- Enter the surface area of the slab or the pavement and choose the coverage rate of the curing compound from the data sheet.
- Enter the number of coats and the allowance for waste and overspray, then choose the container size.
- The calculator finds the volume of compound needed, the number of containers to buy, the total volume purchased and the wet film thickness per coat.
Example
A slab of 5,000 ft² is sprayed with one coat of a compound that covers 200 ft²/gal, with an allowance of 10 % for waste. The volume is 5,000 / 200 × 1 × 1.10 = 27.5 gal. With 5 gallon pails, 27.5 / 5 = 5.5, so 6 pails are bought, or 30 gal in all. The wet film thickness of one coat is 1,604 / 200 = 8.0 mil.
Why it matters
The calculator helps concrete contractors, estimators, suppliers and students to order the right quantity of curing compound for a floor, a pavement or a bridge deck, to compare the container sizes and to check the film thickness of the product.
Good to know
Apply the compound with a clean sprayer, in a uniform film, at the rate of the data sheet, and cover the edges and the sides of the slab as well. Do not walk on the surface or let the rain wash the compound during the first hours. If a floor covering, a paint or a sealer will be applied later, choose a compound that is compatible or that disappears with time, and keep a record of the quantity used to check the rate.
Related tools
The concrete curing calculator plans the curing time and the strength gain, the concrete sealer calculator estimates the sealer for the surface, the concrete volume calculator gives the quantity of concrete and the slab joint spacing calculator checks the joints of the slab.