Estimate the cement bags and sand for a sand and cement floor screed or mortar bed from the floor area, thickness and mix ratio, with a drying time estimate.

Updated on
Your inputs

Value out of range

Value out of range

Value out of range

%

Value out of range

Results

Cement bags

10

Cement

857

Sharp sand

3,809

Volume of screed, including the extra
1.36
Cement content
631 lb/yd³
Rough drying time before floor coverings
62 days
About 1 day per mm for the first 40 mm, then slower; check moisture before laying wood or vinyl

What is a floor screed?

A screed is a layer of sand and cement laid over a concrete slab to give a level, smooth surface for tile, wood, vinyl or carpet. In the US it is often called a mortar bed or “floor mud”, and it is also the classic base for shower floors and underfloor heating. It is mixed with little water, to a damp, crumbly consistency, then compacted and leveled with a straightedge and a float.

How the quantities are worked out

  • Wet volume = area × thickness, plus an allowance for waste and uneven floors
  • Dry volume = wet volume × 1.3, because the air between dry grains disappears when the mix is wetted and compacted
  • Cement volume = dry volume ÷ (1 + sand parts); sand volume is the rest
  • Cement weight at about 1,440 kg/m³ (90 lb/ft³), sand at about 1,600 kg/m³ (100 lb/ft³)
  • Bags = cement weight ÷ bag weight, rounded up

Example

A 200 sq ft floor with a 2-inch screed, a 1:4 mix and 10% extra:

  • Volume: about 1.36 cubic yards
  • Cement: about 857 lb, or 10 bags of 94 lb
  • Sharp sand: about 3,800 lb, close to 2 tons

Mix ratios

Ratio Use
1:3 Thin or heavy-duty screeds, shower pans
1:4 Standard floor screed
1:5 Thick beds where strength matters less
1:6 Lean fill

Use clean, washed sharp sand rather than fine building sand, which shrinks and cracks more.

Thickness

  • Bonded to the slab with a bonding agent: from about 1 inch (25 mm)
  • Unbonded, on a plastic membrane: at least 2 inches (50 mm)
  • Floating, on insulation: at least 2.5 to 3 inches (65 to 75 mm)
  • Over radiant heating pipes: usually at least 1.5 to 2 inches above the pipes

Drying

A screed must dry before most floor coverings go down. A common rule is about 1 day per millimeter of thickness for the first 40 mm, then slower, so a 2-inch screed needs around two months in good conditions. Ventilation and moderate heat speed it up; covering it too early traps moisture that can warp wood or lift vinyl. Test the moisture with a meter, or with the method recommended by the flooring maker, before laying.

Frequently asked questions

What is the usual screed mix?

A cement and sharp sand mix of 1:3 to 1:5 by volume, most often 1:4, mixed with little water to a semi-dry consistency that holds its shape when squeezed in the hand.

Why multiply by 1.3?

Dry sand and cement contain air between their grains. When water is added and the mix is compacted, its volume shrinks by about a quarter, so you need about 1.3 times the finished volume in dry materials.

How thick should a screed be?

At least about 25 mm (1 in) for a screed bonded to the slab, 50 mm (2 in) for an unbonded screed on a membrane and 65 to 75 mm (2.5 to 3 in) for a floating screed on insulation, more over underfloor heating pipes.

How long does a screed take to dry?

A common rule is 1 day per millimeter for the first 40 mm, then slower. Check the moisture with a meter before laying wood, vinyl or other moisture-sensitive floors.

Was this calculator helpful?

Thanks for your feedback!

Results are estimates provided for information purposes. They do not replace professional advice.