Man-hours calculator: how long will the job take with your crew?

Enter the total work in man-hours, the crew size and the hours per day to get the duration in days and weeks, the hours per worker, the worker-days and the labor cost.

Updated on
Your inputs
man-hours

Value out of range

Value out of range

h

Value out of range

$

Value out of range

%

Value out of range

Results

Working days to finish

15.0 days

Weeks of 5 working days
3.0 weeks
Hours per worker
120.0 h
Worker-days
60.0
Labor cost
$19,200

Every job estimate begins with the number of hours of work it needs. This man-hours calculator takes the total work, the number of workers and the hours per day to give the duration in days and weeks, the hours per worker, the worker-days and the labor cost.

How the calculation works

  • Man-hours = number of workers × hours worked by each × days. A crew of 4 working 8 hours a day for 15 days gives 480 man-hours.
  • Duration = total man-hours ÷ (workers × hours per person per day). Adding workers shortens the job in proportion, at least in theory.
  • Worker-days = total man-hours ÷ hours per day, a unit that is common in site planning.
  • Labor cost = man-hours × hourly wage × (1 + added cost for taxes and benefits).

Example

A job needs 480 man-hours. A crew of 4 works 8 hours a day. The duration is 480 ÷ (4 × 8) = 15 working days, or 3.0 weeks. Each worker puts in 120 hours, and the job takes 60 worker-days. At $32 an hour with 25% added for taxes and benefits, the labor cost is 480 × 32 × 1.25 = $19,200.

Why it matters

Contractors, site managers, factory planners and project students use man-hours to price a job, to schedule a crew and to compare quotes. A clear number of hours also makes it easier to see the effect of adding workers or overtime.

Good to know

The result assumes that the work can be shared evenly and that every worker is as productive. Real crews lose time to travel, setup, waiting for materials and weather, and a larger crew often has diminishing returns. Hourly wages and the added cost depend on the country, the trade and the contract. Treat the output as an estimate and add a contingency before you give a price or promise a date.

The labor productivity calculator measures output per hour, the overtime calculator prices extra hours and the hourly wage calculator converts pay between periods.

Frequently asked questions

What is a man-hour?

A man-hour is the work of one person for one hour. A job of 480 man-hours can be done by one worker in 480 hours or by 4 workers in 120 hours each. The term is also written person-hours or labor hours, and it is the base unit of estimating in construction and manufacturing.

How do I estimate the man-hours of a job?

Use a productivity rate, such as hours per square meter of drywall, and multiply it by the quantity. Past jobs, the supplier's guides and industry handbooks give typical rates. Add a margin for setup, breaks, weather and rework, which often add 10 to 20%.

Does doubling the crew halve the time?

Not always. Workers get in each other's way, need more supervision and share tools and space. The effect is a lower output per person as the crew grows, and some tasks cannot be divided at all. Use the calculation as a first estimate and adjust it with experience.

What should the added cost include?

Employers pay social taxes, insurance, paid leave, benefits and sometimes tools and training on top of the wage. The added percentage varies by country and company, and is often 20 to 50%. Use your own figure from payroll records.

Was this calculator helpful?

Thanks for your feedback!

Results are estimates provided for information purposes. They do not replace professional advice.