Skip to content
Omnikalc

Overhead rate calculator: what rate should you charge to jobs, and how far off were you?

Enter estimated and actual overhead and activity to get the predetermined overhead rate, the overhead applied, the under- or over-applied amount and the overhead for a job.

Updated on
Your inputs
$

Value out of range

Value out of range

$

Value out of range

Value out of range

Value out of range

Results

Predetermined overhead rate per hour

$12.00

Overhead applied to production
$494,400
Under-applied (+) or over-applied (−) overhead
$10,600
Under-applied: the costs were higher than what was charged to jobs
Variance as a share of the overhead applied
2.14%
Overhead charged to the job
$1,020.00

This calculator gives estimates for education and planning. It is not investment, tax or legal advice; for decisions about your own situation, talk to a qualified financial professional.

A predetermined overhead rate lets a business charge overhead to jobs before the year’s actual costs are known. The overhead rate calculator takes the estimated overhead and activity base, the actual overhead and activity, and the hours on a job, and gives the rate per hour, the overhead applied, the under- or over-applied amount, the variance as a percentage and the overhead charged to the job.

How the calculation works

  • At the start of the year, set a predetermined overhead rate = estimated overhead ÷ estimated activity base, for example direct labor hours.
  • During the year, charge overhead to jobs at this rate: overhead applied = rate × actual activity base.
  • At year end, compare it with the actual overhead. Actual overhead − applied overhead is positive when overhead was under-applied and negative when it was over-applied.
  • The overhead charged to a job is the rate times the hours the job used.

Example

A factory estimates $480,000 of overhead and 40,000 direct labor hours, so the rate is $12.00 per hour. During the year it uses 41,200 hours and the actual overhead is $505,000. The overhead applied is 12 × 41,200 = $494,400, so overhead is under-applied by $10,600, or 2.14 % of the amount applied. A job of 85 hours is charged $1,020.

Why it matters

Job costs, bids and prices need a figure for overhead long before the books are closed. The predetermined rate supplies it, and the year-end variance shows how reliable it was, which feeds into better estimates next year.

Good to know

The calculator assumes one overhead pool and one activity base. Firms with several pools use a rate for each one. The variance treatment, whether through cost of goods sold or by proration, depends on its size and on accounting rules. The percentage is measured against the overhead applied, a common convention.

The COGS calculator finds the cost of goods sold where an overhead variance may be written off, the break-even calculator uses fixed costs including overhead and the material variance calculator analyzes material costs.

Frequently asked questions

Why use a predetermined rate rather than the actual rate?

Actual overhead is known only at the end of the year, but jobs need a cost when they are finished. A predetermined rate, set from estimates, lets you cost each job as it goes. The difference between estimate and actual is settled at year end.

What is under-applied overhead?

It is the amount by which actual overhead exceeds the overhead charged to jobs. The shortfall is usually added to the cost of goods sold, or split among work in process, finished goods and cost of goods sold if it is large. Over-applied overhead is handled the other way round.

Which activity base should I choose?

Choose the driver that best explains why overhead is incurred, such as direct labor hours in a labor-intensive shop, machine hours in an automated one, or direct labor cost. A base with a weak link to overhead gives distorted job costs, which is why many firms move to activity-based costing.

How can I keep the variance small?

Update the estimates during the year, choose a base that tracks overhead closely and revise the rate if volume changes. A small variance means the rate was a good guide. A large one is a sign that the estimate or the activity base needs rethinking.

Was this calculator helpful?

Thanks for your feedback!

Results are estimates provided for information purposes. They do not replace professional advice.