Your inputs

Value out of range

Value out of range

Value out of range

Value out of range

$

Value out of range

%

Value out of range

Results

Reorder point (units)

711

Safety stock (units)
151
Expected demand during the lead time (units)
560
Safety stock in days of demand
3.8 days
Service factor z
1.64
Yearly cost of holding the safety stock
$362

Run out and you lose a sale; hold too much and your cash is stuck on a shelf. The reorder point is the stock level that triggers a new order, and the safety stock is the cushion inside it that protects you from busy weeks and late deliveries. This calculator combines the average demand, the lead time and their variation with the service level you want.

How the calculation works

  • Demand during the lead time = average daily demand × lead time
  • Standard deviation during the lead time = √(lead time × σ² of daily demand + (daily demand)² × σ² of the lead time)
  • Safety stock = z × that standard deviation, with z read from the service level
  • Reorder point = demand during the lead time + safety stock
  • Holding cost = safety stock × unit cost × annual holding rate

The z factor is 1.28 for 90 %, 1.645 for 95 %, 1.96 for 97.5 %, 2.33 for 99 % and 3.09 for 99.9 %.

Example

A shop sells 40 units a day on average, with a standard deviation of 12, and the supplier delivers in 14 days give or take 2. Demand during the lead time is 560 units; the standard deviation is √(14 × 144 + 1,600 × 4) = 91.7 units. For a 95 % service level (z = 1.645), safety stock is 151 units and the reorder point 711 units. Holding that safety stock at $12 a unit and 20 % a year costs about $362 a year.

Why it matters

Both mistakes cost money, but in different ways, and the reorder point puts a number on the trade. It tells staff or software exactly when to order and reveals that the lead time uncertainty can matter more than the demand uncertainty: a supplier that is late by a week can need more safety stock than a customer who buys erratically.

Good to know

Use consistent units for demand and time. The method assumes demand follows a roughly normal pattern, that the lead time does not depend on demand, and that unfilled demand is lost or backordered. Seasonal items need a reorder point per season, and an item with a long lead time benefits from checking the supplier’s real history rather than the quoted promise. This tool is for education.

The EOQ calculator finds the best order size, the inventory turnover calculator checks how fast stock sells, and the z-test and normal distribution tools explain the service factor.

Frequently asked questions

What is a reorder point?

It is the stock level at which you place a new order so that the delivery arrives before you run out. It equals the demand expected during the lead time plus a safety stock that covers variation.

How is safety stock calculated?

Safety stock = z × the standard deviation of demand during the lead time, where z comes from the service level (1.645 for 95 %). When both demand and lead time vary, the standard deviation is √(lead time × σ² of demand + demand² × σ² of lead time).

Which service level should I choose?

Higher levels cost more stock: going from 95 % to 99 % raises the safety stock by about 40 %. Choose a high level for items that cost you a lot when missing (a key part, a best seller) and a lower level for slow or cheap items.

Does this work for items with irregular demand?

Poorly. The formula assumes that demand is roughly normal. For items sold rarely or in lumps, the safety stock is better set by looking at the history of the biggest orders and the supplier's reliability.