The cost of goods manufactured (COGM) is what a factory spent to finish its products in a period. The cost of goods manufactured calculator builds the schedule from materials, labor and overhead, adjusts for the work in process, and goes on to the cost of goods sold and the cost per unit.
How the calculation works
- Enter the raw materials inventory at the start and at the end of the period, and the purchases of the period.
- Enter the direct labor and the manufacturing overhead of the period.
- Enter the work in process at the start and at the end, and the finished goods at the start and at the end.
- The calculator gives the direct materials used, the total manufacturing costs, the cost of goods manufactured, the cost of goods sold and the cost per unit.
Example
Raw materials start at $25,000, $140,000 are bought, and $30,000 remain, so the direct materials used are $135,000. With $90,000 of direct labor and $110,000 of overhead, the total manufacturing costs are $335,000. The work in process goes from $20,000 to $25,000, so the cost of goods manufactured is 335,000 + 20,000 − 25,000 = $330,000, or $30.00 per unit for 11,000 units. The finished goods go from $40,000 to $35,000, so the cost of goods sold is $335,000.
Why it matters
The calculator helps accounting students, controllers and owners of small factories to prepare the schedule of the cost of goods manufactured, to check the figures that feed the income statement and to find the cost per unit. It shows the steps in the order of the usual accounting textbooks.
Good to know
The calculator uses the standard periodic format with actual costs and does not handle standard costing variances, abnormal spoilage or the capitalization rules of a specific country. The inventories must be valued with a consistent method. The cost per unit is the average of the completed units and does not show the cost of each product, which needs a costing system.
Related tools
The prime cost calculator adds the direct materials and the direct labor, the overhead rate calculator finds the rate used to apply overhead, the inventory turnover calculator measures how quickly goods sell, and the activity-based costing calculator allocates overhead by activities.