Kanban calculator: how many kanban cards does a loop need?

Enter daily demand, lead time, safety factor and container size to get the number of kanban cards and the inventory the loop holds.

Updated on
Your inputs
units

Value out of range

days

Value out of range

%

Value out of range

Value out of range

$

Value out of range

Results

Kanban cards (containers) needed

22

Value of the inventory in the loop

$13,200

Exact number before rounding up
22.00
Maximum inventory in the loop
1,100 units
Days of demand held
2.2 days

A kanban system limits inventory by the number of cards in each replenishment loop. This kanban calculator takes daily demand, replenishment lead time, a safety factor and container size and gives the number of kanban cards, the maximum inventory in the loop, its value and the days of demand it represents.

How the calculation works

  • Cards needed = daily demand × lead time × (1 + safety factor) ÷ units per container, rounded up.
  • Inventory in the loop = number of cards × units per container.
  • Inventory value = inventory in the loop × cost per unit.
  • Days of demand held = inventory in the loop ÷ daily demand.

Example

A cell uses 500 parts a day, replenishment takes 2 days, the safety factor is 10 % and containers hold 50 parts. The exact figure is 22.0, so the loop needs 22 cards. That holds up to 1,100 parts, worth $13,200 at $12 each, or 2.2 days of demand. Cutting the lead time to 1 day would halve the number of cards.

Why it matters

Too few cards starve the line, and too many bring back the inventory that kanban is meant to remove. The calculation links the cards to lead time and demand, so you can see what a shorter lead time or a smaller container would save and set a target for improvement. It also helps size supermarket shelves and supplier shipments.

Good to know

Cards are always rounded up, which adds a little extra stock, and the safety factor should start high and shrink as the process stabilizes. Use the demand for the period when the loop is busiest. The lead time includes transport, queue time and production, not only run time. Containers should be a size that people can handle and that suits the part, which is often smaller than a supplier’s standard pack. Track the number of cards in circulation, because lost cards quietly change the loop.

The reorder point calculator sets a replenishment trigger, the EOQ calculator finds the best order size, and the takt time calculator sets the pace of a line.

Frequently asked questions

What is a kanban card?

A signal that triggers production or replenishment of a container of parts. The number of cards in a loop sets the maximum inventory.

How do I reduce the number of kanban cards?

Shorten the lead time, use smaller containers and cut variability. Fewer cards mean less inventory.

What is the safety factor?

A percentage added to cover variation in demand and lead time. Lean teams reduce it over time as the process becomes stable.

Is the number of cards fixed?

No. Review it when demand or lead time changes, and remove cards as the system improves.

Was this calculator helpful?

Thanks for your feedback!

Results are estimates provided for information purposes. They do not replace professional advice.