OEE calculator: how effectively is your equipment running?

Enter planned time, downtime, ideal cycle time and piece counts to get availability, performance, quality and overall equipment effectiveness.

Updated on
Your inputs
minutes

Value out of range

minutes

Value out of range

seconds

Value out of range

Value out of range

Value out of range

Results

OEE

69.3%

Typical: room to improve
Availability
90.2%
Performance
80.8%
Quality
95.0%
Fully productive time lost
147 minutes
Defective pieces
35

Overall equipment effectiveness shows how much of the time you plan to produce is really spent making good parts at full speed. This OEE calculator computes availability, performance and quality from your planned time, downtime, ideal cycle time and piece counts, multiplies them into OEE and shows the time lost and the defective pieces.

How the calculation works

  • Availability = (planned production time − downtime) ÷ planned production time.
  • Performance = ideal cycle time × total pieces ÷ run time.
  • Quality = good pieces ÷ total pieces.
  • OEE = availability × performance × quality.
  • Time lost = (1 − OEE) × planned production time.

Example

A machine is scheduled for 480 minutes and loses 47 minutes to downtime, so availability is 90.2 %. In 433 minutes of running it makes 700 pieces with an ideal cycle of 30 seconds, so performance is 80.8 %. 665 pieces are good, so quality is 95 %. OEE is 69.2 %, which means about 148 minutes of the shift were not fully productive.

Why it matters

A machine can look busy and still waste a third of its capacity on stops, slow running and scrap. OEE splits that loss into three parts you can act on, so a team can see whether the problem is breakdowns, slow cycles or quality, and put its improvement effort where it pays most.

Good to know

Use the ideal cycle time from the design or the best sustained run and not the average, or the performance will look better than it is. Count scrap and rework as non-good pieces, since they use time but do not generate sales. OEE is for a single machine or line, so compare it over time and against a target and not across very different processes. Planned downtime, such as scheduled maintenance, is normally excluded from planned production time. A very high OEE on a bottleneck matters more than on a machine that has spare capacity.

The labor productivity calculator measures output per hour, the takt time calculator sets the pace you need, and the inventory turnover calculator shows how fast stock moves.

Frequently asked questions

What is OEE?

Overall equipment effectiveness, a measure of how much of your planned production time is truly productive. It combines availability, performance and quality.

What is a good OEE?

World-class manufacturers aim for 85 percent. Many plants run between 40 and 70 percent, which shows room to improve.

What counts as downtime?

Breakdowns, changeovers, material shortages and any stop long enough to log. Short stops usually fall under performance.

Which factor should I improve first?

Start with the largest loss. Availability losses are often the easiest to find, while performance and quality losses need detailed data.

Was this calculator helpful?

Thanks for your feedback!

Results are estimates provided for information purposes. They do not replace professional advice.