Enter the tons recycled by stream, the tons reused and the tons landfilled to get the diversion rate of a construction project, the streams, the credit level and the tons still to divert.

Updated on
Your inputs
tons

Value out of range

tons

Value out of range

tons

Value out of range

tons

Value out of range

tons

Value out of range

tons

Value out of range

tons

Value out of range

ft²

Value out of range

Results

Diversion rate

69.0 %

50 % to 75 %: more diversion would earn the higher level
Material streams diverted
6
Waste generated per floor area
11.6 lb/ft²
Additional tons to divert to reach 75 %
17.5 tons
Credit level reached (LEED v4 path 1)
1 points

The construction waste diversion rate calculator divides the tons recycled or reused by the total tons generated to give the diversion rate of a construction or demolition project, the number of material streams and the credit level of a green building rating.

How the calculation works

  • Enter the tons recycled of each stream: concrete and masonry, wood, metal, drywall, cardboard, and the tons salvaged for reuse.
  • Enter the tons sent to the landfill and the floor area of the project.
  • The calculator gives the diversion rate, the number of material streams, the waste per floor area and the credit level of a green building rating.

Example

A project recycles 120 tons of concrete, 40 of wood, 12 of metal, 18 of drywall and 6 of cardboard, reuses 4 tons and sends 90 tons to the landfill. The diverted total is 200 tons and the generated total is 290 tons, so the diversion rate is 69.0 % with 6 streams. That is the level of 1 point, and 17.5 more tons moved from the landfill to recycling would reach 75 % and 2 points. The waste is 11.6 lb per ft² of floor area on 50,000 ft².

Why it matters

The calculator helps contractors, project managers, sustainability consultants and owners to track a waste management plan, to see how many tons are missing to reach a target and to document a credit with the weight tickets of the hauler.

Good to know

Count the weights from tickets, not the number of containers, and put each ticket in the stream it belongs to, because a mixed container that is sorted at a processing facility is credited with the facility’s recovery rate, not 100 %. Keep the clean streams separate to get the best fee and the cleanest credit. A project with a very low total waste can reach a high rate by one large load, so look also at the waste per floor area, which shows if the project generates much more waste than similar ones. The rating rules of your project decide what counts, so check them before you rely on the credit level.

The house demolition cost calculator gives the cost of a demolition, the earthwork calculator converts bank, loose and compacted volumes, the dump truck calculator gives loads and payload and the concrete volume calculator gives the quantity of a pour.

Frequently asked questions

What is the diversion rate?

The diversion rate is the share of the construction and demolition waste that does not go to the landfill, so the tons recycled, reused or salvaged divided by the total tons generated, which is the diverted tons plus the landfilled tons. A rate of 75 % means that three tons out of four are recycled or reused.

What does a green building rating ask?

In LEED v4 the construction and demolition waste management credit gives 1 point for diverting at least 50 % of the waste with at least three material streams, and 2 points for at least 75 % with at least four streams. Soil, rock and land clearing debris are usually excluded, and the rules and the version of the rating system of your project govern.

How do I raise the rate?

The largest and easiest streams are the heavy ones: concrete, masonry, metal and clean wood, which a local recycler often takes at a lower fee than the landfill. Separate them on site in labeled containers, keep contaminated loads out, ask the hauler for weight tickets and track the tons each month so the rate does not become a surprise at the end.

What does the calculator leave out?

The calculator leaves out hazardous waste, soil and rock, the alternative daily cover and the waste-to-energy conversion that some ratings do not count as diversion, and the volume-to-weight conversions of a mixed dumpster. Use weights from the tickets, not estimates.