A curbside mailbox must sit at the right height for the mail carrier to reach it from the vehicle, and its post must be buried deep enough to stand straight for years. This calculator works out the post height above ground, the total post length, the concrete for the hole and the number of bags.
How the calculation works
- Post above ground = height of the mailbox bottom − mount or arm thickness
- Post length = post above ground + depth in the ground
- Concrete = hole volume (π × diameter² ÷ 4 × depth) − the post’s own volume below ground
- Bags = concrete ÷ yield per bag, rounded up
For a mailbox bottom 42 in above the road, sitting on a 2 in mount, the post stands 40 in out of the ground. Buried 24 in, it must be 64 in long. A 10 in hole around a 4 × 4 post (3.5 in actual) takes about 0.92 cu ft of concrete, or 3 bags of 0.375 cu ft.
USPS guidelines
| Item | Guideline |
|---|---|
| Height of the box bottom or door | 41 to 45 in above the road surface |
| Setback | front of the box 6 to 8 in back from the curb or road edge |
| House number | on the box or post, visible from the road |
Your local postmaster has the final word, so ask before installing a new box, especially on a new road. Boxes must also be an approved design.
Choosing the post
- 4 × 4 treated lumber is the most common, often with a short arm to hold the box over the road edge.
- Steel posts last longer and come with brackets for standard boxes.
- Breakaway designs are safer: many states recommend posts that bend or break if a car hits them, and discourage brick pillars or heavy steel along fast roads.
Setting the post
- Call 811 a few days before you dig, so buried utility lines are marked.
- Dig the hole a little deeper than the post depth and add 3 to 4 in of gravel for drainage.
- Set the post, check it is plumb on two sides and brace it.
- Fill with concrete, sloping the top away from the post so water runs off.
- Wait the time on the bag, often 24 to 48 hours, before attaching the box.
In cold climates, go below the frost line or at least 24 in deep so frost heave does not tilt the post. In loose soil, a wider hole adds stability. Some homeowners skip concrete and pack gravel firmly around the post instead, which drains better and makes replacing the post easier.