High-low method calculator for mixed costs: variable cost per unit, fixed cost and cost forecast

Enter the total cost at the highest and at the lowest activity levels, and an expected activity, to split a mixed cost into variable and fixed parts and to predict the cost.

Updated on
Your inputs
units

Value out of range

$

Value out of range

units

Value out of range

$

Value out of range

units

Value out of range

Results

Variable cost per unit

$5.00

Fixed cost per period
$24,000
Predicted total cost at the expected activity
$74,000
Predicted cost per unit
$7.40
Fixed cost as a share of the predicted cost
32.4 %

Many costs have a fixed part and a variable part. The high-low method calculator uses the highest and the lowest activity levels to estimate the variable cost per unit and the fixed cost, and then predicts the total cost for a new level of activity.

How the calculation works

  • Find, in your records, the period with the highest activity level and the period with the lowest activity level, and enter the total cost of each (not the highest and lowest costs).
  • Enter the activity level you expect for the next period.
  • The calculator finds the variable cost per unit = (high cost − low cost) / (high activity − low activity).
  • It then finds the fixed cost = high cost − variable cost × high activity, and the predicted cost = fixed cost + variable cost × expected activity.

Example

A plant spent $84,000 at its highest activity of 12,000 units, and $59,000 at its lowest activity of 7,000 units. The variable cost is (84,000 − 59,000) / (12,000 − 7,000) = $5.00 per unit. The fixed cost is 84,000 − 5 × 12,000 = $24,000. For an expected activity of 10,000 units, the predicted cost is 24,000 + 5 × 10,000 = $74,000, or $7.40 per unit, of which 32.4 % is fixed.

Why it matters

The calculator helps accounting students, managers and small business owners to build a cost equation from just two observations, to prepare a budget and to feed a break-even or flexible budget analysis. It also shows how much of the predicted cost is fixed, which tells how much the cost will change if the activity changes.

Good to know

The high-low method uses only two data points and assumes a linear cost behavior inside the relevant range. It can be misleading if one of the points is unusual. For decisions of size, use a regression on many observations. The costs and activities must be taken from the same periods and with the same unit of measure.

The break-even calculator uses the cost equation to find the sales needed, the overhead rate calculator finds the rate used to apply overhead, the flexible budget variance calculator separates volume from spending, and the operating leverage calculator shows the effect of fixed costs on profit.

Frequently asked questions

What is the high-low method?

The high-low method is a simple way to split a mixed cost, such as electricity, maintenance or a phone bill, into its variable and fixed parts. It uses only two points of data: the period with the highest activity and the period with the lowest activity. The change in cost between these two points divided by the change in activity gives the variable cost per unit, and the rest of the cost is the fixed part.

Why do I choose the periods by activity and not by cost?

The method needs the two extreme levels of the cost driver, such as units produced, machine hours or labor hours, because the slope is the cost per unit of activity. The highest cost is not always at the highest activity, since it can come from a one-time repair or a price rise. Take the costs that go with the highest and the lowest activity levels.

How accurate is the method?

It is quick and easy, but it is based on only two points, so an unusual period can distort the result. A regression using all the data points is more reliable, and a scatter plot of the data can show if the high and low points are typical. The method also assumes that the cost is linear over the range of the data, which means that the prediction outside the range is risky.

When is the high-low method used?

It is used in managerial accounting courses, for quick budgets, for the first analysis of a cost, and when only a small amount of data is available. The results feed the cost equation, total cost = fixed cost + variable cost × activity, which is used in break-even analysis, in flexible budgets and in what-if planning.