Skip to content
Omnikalc

Is your process capable of meeting the specification?

Enter the upper and lower specification limits, the process mean and its standard deviation: get Cp, Cpk, the sigma level and the expected parts per million outside the tolerance.

Updated on
Your inputs

Value out of range

Value out of range

Value out of range

Value out of range

Results

Cpk (actual capability)

1.33

Capable: meets the usual requirement of 1.33 or more

Expected parts out of specification

39.0 ppm

Cp (potential capability)
1.39
Cpu (upper side)
1.33
Cpl (lower side)
1.44
Sigma level (3 × Cpk)
4.00

Process capability tells you whether a process can consistently produce parts inside the specification limits. A process can be stable and still make out-of-tolerance parts if its natural spread is wider than the tolerance, or if its average is off target. The indices Cp and Cpk summarize this in one number each, and are widely used in manufacturing and quality control.

How the calculation works

  • Cp = (USL − LSL) ÷ (6 × standard deviation)
  • Cpu = (USL − mean) ÷ (3 × standard deviation), and Cpl = (mean − LSL) ÷ (3 × standard deviation)
  • Cpk = the smaller of Cpu and Cpl
  • Sigma level = 3 × Cpk
  • Parts out of specification = the share of a normal distribution beyond either limit, in parts per million

Example

A shaft diameter must be between 9.5 and 10.5 mm. The process averages 10.02 mm with a standard deviation of 0.12 mm. Cp is 1 ÷ 0.72 = 1.39. The mean sits closer to the upper limit: Cpu = 0.48 ÷ 0.36 = 1.33 and Cpl = 1.44, so Cpk is 1.33, a sigma level of 4.0. About 39 parts per million are expected to fall out of specification.

Reading Cp and Cpk

A large gap between Cp and Cpk means the process is capable but off center, so centering it on the target is the cheapest improvement. If Cp itself is low, the process spread is too wide and needs a reduction in variation: better materials, tooling, maintenance or method. Typical targets are 1.33 for ongoing production, 1.67 for new processes and safety characteristics.

Conditions for a valid result

Capability indices only make sense when the process is stable, meaning in statistical control. Check a control chart first, and use enough measurements, usually at least 30 and ideally 100 or more. If the data are clearly not normal, as with a measurement bounded at zero, the ppm figure can be far off and a non-normal method is better.

Frequently asked questions

What is the difference between Cp and Cpk?

Cp compares the width of the tolerance with the process spread, ignoring where the process is centered. Cpk also penalizes a process that is off center.

What is a good Cpk?

A Cpk of 1.33 is the usual minimum for an established process, and 1.67 or more for critical characteristics. Below 1 the process is not capable.

Does it assume a normal distribution?

Yes. The ppm estimate assumes the measurements follow a normal distribution with a stable mean and standard deviation.

Which standard deviation should I use?

For Cp and Cpk, use the within-subgroup (short-term) standard deviation. With the overall standard deviation, the same formulas give Pp and Ppk.

Was this calculator helpful?

Thanks for your feedback!

Results are estimates provided for information purposes. They do not replace professional advice.