Skip to content
Omnikalc

Bucket elevator capacity calculator: capacity and motor power of a vertical elevator

Enter the bucket size, fill, spacing, speed, material density and lift height of a bucket elevator to get the capacity in cubic feet and tons per hour, the lifting power, the motor power and the number of buckets.

Updated on
Your inputs
ft³

Value out of range

%

Value out of range

in

Value out of range

ft/min

Value out of range

lb/ft³

Value out of range

ft

Value out of range

%

Value out of range

%

Value out of range

Results

Mass capacity

42.19 tons/h

Volumetric capacity
1,687.5 ft³/h
Power to lift the material
1.70 hp
Motor power required
2.31 hp
Number of buckets on the belt or chain
80

The bucket elevator capacity calculator gives the volumetric and mass capacity, the lifting power, the motor power and the number of buckets of a vertical bucket elevator from the bucket size, the fill, the spacing, the speed, the density and the lift height.

How the calculation works

  • Enter the volume of one bucket, the fill factor (about 75% for free-flowing materials), the spacing between buckets and the belt or chain speed.
  • Enter the bulk density of the material and the lift height from the center of the boot pulley to the center of the head pulley.
  • The calculator finds the volumetric capacity = bucket volume × fill × buckets per foot × speed, and the mass capacity.
  • It gives the power to lift the material, the motor power with the drive efficiency and an allowance for digging and loading, and the number of buckets.

Example

A bucket elevator has 0.15 ft³ buckets filled to 75% at a 12 in spacing and runs at 250 ft/min. The volumetric capacity is 0.15 × 0.75 × 1 × 250 × 60 = 1,687.5 ft³/h. With grain of 50 lb/ft³, the mass capacity is 42.19 tons/h. For a 40 ft lift, the lifting power is 1.70 hp. With a digging allowance of 15% and a drive efficiency of 85%, the motor is 1.70 × 1.15 / 0.85 = 2.31 hp, and the belt carries 80 buckets.

Why it matters

The calculator helps grain and feed mill operators, cement and mining plant engineers, material handling designers and students to size an elevator, to check an existing one against a higher throughput and to select a motor. It is a quick check before using the manufacturer’s catalog.

Good to know

Use the real bucket volume and the real bulk density of the material. Check the speed with the head pulley diameter, so that the discharge is right for the elevator type. Add a service margin to the motor. Use the manufacturer’s tables for the final choice of the bucket, the belt strength and the pulleys.

The belt conveyor capacity calculator covers horizontal and inclined belts, the screw conveyor capacity calculator covers augers, the motor current calculator checks the supply and the density calculator converts masses and volumes.

Frequently asked questions

How is the capacity of a bucket elevator computed?

The capacity is the volume carried by each bucket, times the fill factor, times the number of buckets that pass the head pulley each hour. The number of buckets per hour is the belt speed divided by the spacing. Multiplying by the bulk density gives the mass flow. The calculator uses the rated bucket volume, which is the struck volume to the brim, and a fill factor for the real loading.

What fill factor should I use?

A fill factor of 75% is typical for dry, free-flowing materials such as grain, and a factor of 60 to 70% for damp, sticky or lumpy materials. Buckets are not filled to the brim, because part of the material spills during the loading and the discharge. The manufacturer’s capacity tables use a fill of 75% for continuous-discharge elevators and sometimes lower values for centrifugal discharge.

How is the motor power computed?

The main part is the power to lift the material over the height of the elevator. An allowance of 10 to 30% is added for digging the material at the boot, for the drag of the scooping, and for the weight of buckets and the belt, which is balanced between the two legs. The total is divided by the drive efficiency. A starting margin is also needed, since elevators must start under load in some cases.

What speed is suitable?

The speed depends on the discharge type. Centrifugal discharge elevators run at 200 to 350 ft/min (1 to 1.8 m/s) with the buckets spaced out, and the speed must make the material leave the bucket at the head pulley. Continuous or gravity discharge elevators run slower, at 100 to 200 ft/min, for fragile or sticky products. A too-high speed causes back-legging and wear.

Was this calculator helpful?

Thanks for your feedback!

Results are estimates provided for information purposes. They do not replace professional advice.