The construction bid price calculator builds up the bid price of a project from the direct cost by adding the general conditions, the contingency, the overhead, the profit and the bond premium, and shows the markup over cost and the margin on the price.
How the calculation works
- Enter the direct cost of the work and the percentages for the general conditions, the contingency, the overhead and the profit.
- Enter the bond premium as a percent of the bid price.
- The calculator adds each layer in turn and gives the bid price, the profit, the bond premium, the markup over the direct cost and the margin on the price.
Example
The direct cost is $2,000,000. General conditions of 8 % give $2,160,000. A 3 % contingency gives $2,224,800, 7 % of overhead gives $2,380,536 and 5 % of profit gives $2,499,563. A bond premium of 1.2 % of the price makes the bid price $2,499,563 / (1 − 0.012) = $2,529,922. The profit is $119,027, which is 4.7 % of the price, and the markup over the direct cost is 26.5 %.
Why it matters
The calculator helps estimators, contractors, subcontractors and owners to turn a takeoff into a price, to see how much each layer adds, to compare a bid with the cost of the work and to find the price that gives the profit you want.
Good to know
Apply each percent to the base that your company uses, since firms differ on whether the overhead and the profit apply to the direct cost or to the subtotal. Keep the general conditions as a list of items for the job and not only a percent, since a long job or a remote site raises them. Do not drop the contingency to win a bid without a reason. Check the margin on the price and not only the markup, because a markup of 15 % is a margin near 13 %. Add the sales tax and the escalation if the bid form wants them, and compare the final price with the budget of the owner.