Formwork lateral pressure calculator: concrete pressure on wall forms from the placement rate and temperature

Enter the rate of placement, the concrete temperature, the form height, the unit weight, the chemistry and the tie spacing to get the ACI 347 lateral pressure, the hydrostatic limit, the design pressure and the load on a form tie.

Updated on
Your inputs
ft/h

Value out of range

°F

Value out of range

ft

Value out of range

lb/ft³

Value out of range

ft

Value out of range

ft

Value out of range

Results

Design lateral pressure

793 psf

Pressure from the ACI 347 equation
793 psf
Hydrostatic pressure of the full height
1,800 psf
Depth of the full pressure below the top
5.3 ft
Load on one form tie
3,171 lb

The formwork lateral pressure calculator gives the pressure of fresh concrete on a wall form with the ACI 347 equation, from the rate of placement, the temperature and the unit weight, with the hydrostatic limit, the design pressure and the load on a form tie.

How the calculation works

  • Enter the rate of placement of the concrete in feet per hour (the equation of ACI 347 is for walls placed at up to 7 ft/h), the temperature of the concrete and the height of the form.
  • Enter the unit weight of the concrete and choose its chemistry: a retarder or a high content of slag or fly ash increases the pressure.
  • Enter the spacing of the form ties in both directions.
  • The calculator finds the pressure from the equation, the hydrostatic limit, the design pressure (the lesser one, with the minimum), the depth of the full pressure and the load on a tie.

Example

A 12 ft wall is placed at 5 ft/h with concrete at 70 °F of 150 lb/ft³, without retarder. The ACI 347 equation gives p = 150 + 9,000 × 5 / 70 = 792.9 psf. The hydrostatic pressure of the full height is 150 × 12 = 1,800 psf, so the design pressure is 793 psf. It acts from a depth of 792.9 / 150 = 5.3 ft below the top. With ties at 2 ft by 2 ft, each tie carries 792.9 × 4 = 3,171 lb.

Why it matters

The calculator helps concrete contractors, formwork designers, site engineers and students to check that the forms, the walers and the ties can resist the pressure of the pour, to see the effect of a faster placement or a retarder and to avoid a blowout, which is dangerous and expensive. It gives the pressure before the choice of the form system.

Good to know

Use the real rate of placement of the pour, not the average one of the day, and the lowest temperature expected at the time of the pour. Take the full hydrostatic pressure for self-consolidating concrete and for pours that are pumped from the bottom. Reduce the spacing of the ties where the pressure is highest, near the bottom, and always keep a safety factor on the tie capacity.

The concrete formwork calculator gives the area of the forms and the plywood, the concrete volume calculator gives the quantity of the pour, the concrete curing calculator covers the time before the forms are stripped and the load combinations calculator combines design loads.

Frequently asked questions

What does the pressure of fresh concrete depend on?

Fresh concrete behaves like a liquid until it starts to stiffen, so the form must resist its pressure. The pressure depends mainly on the rate at which the form is filled, because the faster the placement, the less time the lower layers have to set, and on the temperature, because the concrete stiffens more slowly when it is cold. The unit weight, the chemistry of the cement and the use of retarders also change it.

What is the ACI 347 equation?

For walls placed at less than 7 ft/h and with a height of up to 14 ft, ACI 347 gives p = Cw Cc (150 + 9,000 R / T) in psf, where R is the rate of placement in ft/h, T the temperature in °F, Cw the unit weight coefficient and Cc the chemistry coefficient. The pressure is not less than 600 Cw and not more than the hydrostatic pressure w h, nor than 2,000 psf.

How is the load on a tie found?

A form tie holds the pressure over the area that it serves, so its load is the design pressure multiplied by the horizontal and the vertical spacing. With 793 psf and ties at 2 ft by 2 ft, the load is 3,171 lb. The tie, its fitting and the walers must have an allowable load larger than this, with the safety factor of the manufacturer, usually 2 or 2.5.

What are the limits of the calculator?

The calculator applies the wall equation. Columns, very fast placements above 7 ft/h, self-consolidating concrete, pumping from the bottom, and internal vibration deeper than 4 ft all call for other equations or for the full hydrostatic pressure. The values come from ACI 347 as commonly stated, and the design of the formwork must be checked by a qualified engineer or the form supplier.