Poured foundation wall concrete and rebar calculator

Enter the length, the height, the thickness, the openings and the bar layout to get the concrete, the number of bars, the weight of rebar and the formwork area.

Updated on
Your inputs
ft

Value out of range

ft

Value out of range

in

Value out of range

ft²

Value out of range

%

Value out of range

in

Value out of range

ft

Value out of range

Value out of range

Results

Concrete with the waste

28.0 yd³

Net area of the wall
1,080 ft²
Number of vertical bars
106
Total length of rebar
1,623 ft
Weight of rebar
1,084 lb
Area of formwork, both faces
2,160 ft²

The poured foundation wall calculator gives the net area, the concrete in cubic yards with the waste, the number of vertical bars, the length and the weight of rebar and the formwork area of a foundation or basement wall, from its length, height, thickness and bar layout.

How the calculation works

  • Enter the length, the height and the thickness of the wall and the openings to deduct.
  • Enter the waste, the bar size, the spacing of the vertical bars, the dowel length and the rows of horizontal bars.
  • The calculator gives the net area, the concrete, the number of bars, the rebar length and weight and the formwork area.

Example

A foundation wall 140 ft long, 8 ft high and 8 in thick, with 40 ft² of openings, has a net area of 1,120 − 40 = 1,080 ft². The concrete is 1,080 × 8 / 12 / 27 = 26.7 yd³, and with 5 % of waste, 28.0 yd³. With #4 bars at 16 in there are 106 vertical bars of 8 + 1.5 = 9.5 ft, and 4 rows of horizontal bars with a 10 % lap, a total of 1,623 ft and 1,084 lb. The formwork is 2 × 1,080 = 2,160 ft².

Why it matters

The calculator helps builders, concrete contractors, estimators and owners to order the concrete and the rebar of a foundation wall, to plan the formwork and to compare the cost of a thicker wall with the cost of more steel.

Good to know

Order the concrete by the truck load and round up to the next half yard, since a short pour leaves a cold joint in the wall. Check the thickness of each section on the plans, because a pilaster or a thicker part under a beam adds volume. Place the vertical bars in the center of the wall unless the drawings say otherwise, and keep the cover on the earth face at 2 in or more.

The concrete volume calculator gives the volume of other shapes, the concrete formwork calculator gives the plywood and lumber for the forms, the footing size calculator sizes the strip footing under the wall and the welded wire mesh calculator counts the sheets of a slab.

Frequently asked questions

How is the concrete volume found?

The volume is the net area of the wall, which is the length times the height less the openings, times the thickness. Divide by 27 to get cubic yards when the dimensions are in feet and inches. Add 3 to 7 % for the waste, the spillage, the uneven excavation and the form deflection. The footing is a separate pour with its own volume, so use the footing calculator for it, and the stem wall volume here.

How are the bars counted?

The vertical bars are spaced along the length, so their number is the length divided by the spacing, rounded up, plus one. Each bar is as long as the wall plus a length for the dowel into the footing and the lap at the top. The horizontal bars are counted as rows over the whole length, with 10 % added for the laps and the corners. Check the drawings for the rows near the top, around the openings and at the corners.

How much rebar does a basement wall need?

A residential basement wall of 8 in often uses #4 vertical bars at 16 to 48 in and 2 to 4 horizontal bars, but the amount depends on the height of the backfill, the soil, the top support and the code. The engineer states the bar size and spacing. The calculator only counts the quantity of the layout you enter, and it does not design the wall.

What does the calculator leave out?

The calculator does not count the footing, the keyway, the anchor bolts, the corner bars, the extra bars at the openings or the ties and the chairs. It also does not count the vapor barrier, the damp-proofing, the drain and the backfill. Add the form ties, the wall braces and the form oil to the formwork list, and ask the supplier for the minimum order of the concrete.