Temporary power calculator: demand load and generator size for a jobsite

Enter the loads of the offices, the lighting, the hoists, the tools and the equipment, the demand factor, the power factor, the voltage and the reserve to get the demand, the kVA, the current and the generator.

Updated on
Your inputs
kW

Value out of range

kW

Value out of range

kW

Value out of range

kW

Value out of range

kW

Value out of range

Value out of range

Value out of range

%

Value out of range

Results

Generator or service size

92.6 kVA

Connected load
90 kW
Demand load
63.0 kW
Apparent power
74.1 kVA
Line current
89.1 A

The temporary power calculator gives the connected load, the demand load, the apparent power in kVA, the line current and the generator or service size of a construction site, from the loads, the demand factor, the power factor and the voltage.

How the calculation works

  • Enter the connected loads of the offices, the lighting, the hoists, the tools and the other equipment.
  • Enter the demand factor, the power factor, the supply voltage and the reserve for growth and motor starting.
  • The calculator finds the demand load, the apparent power, the line current and the generator or service size.

Example

A site has 12 + 8 + 30 + 25 + 15 = 90 kW of connected load. With a demand factor of 0.70, the demand is 63.0 kW, which is 63 / 0.85 = 74.1 kVA at a power factor of 0.85. At 480 V three-phase, the line current is 74,118 / (1.732 × 480) = 89.1 A. With a 25 % reserve, the generator or the service must be at least 92.6 kVA.

Why it matters

The calculator helps site managers, electrical contractors, estimators and students to size the temporary power or the generator of a job, to compare the cost of a generator and of a temporary service, and to check the current in the feeder of the site.

Good to know

Keep a list of the loads of the site and update it when new equipment arrives. Use ground-fault protection on all the outlets of the site, protect the cables from the traffic and from the water, and keep the generator ventilated and away from the air intakes. Check the voltage at the end of the long feeders, and balance the single-phase loads over the three phases.

The generator size calculator sizes a standby generator, the transformer calculator sizes the transformer of a temporary service, the conduit fill calculator checks the conduits and the voltage regulation calculator checks the voltage at the end of a feeder.

Frequently asked questions

What is the connected load of a site?

The connected load is the sum of the power of all the equipment that can be connected at the same time on the site. It includes the offices and trailers, the lighting, the hoists and cranes, the welders and the power tools, the pumps and the heaters. It is the sum of the ratings, and it is higher than the real demand because the equipment is never all at full power at the same time.

What is the demand factor?

The demand factor is the ratio of the maximum demand of the site to the connected load. It takes into account that all the loads do not work together and at full power. For a construction site, a value between 0.5 and 0.8 is common, and it is lower for a large site with many independent crews. A site with a few large loads, like a crane and a hoist, has a higher factor.

Why is a reserve added?

The electric motors draw several times their rated current at starting, and a generator must be able to carry this surge without a large drop of voltage. A reserve also leaves room for the growth of the site, since new equipment is added during the job. A reserve of 20 to 30 % is usual, and a larger one is chosen when large motors start directly on the line.

What are the limits of the calculator?

The calculator gives a first estimate of the size of the power supply. It does not replace the load calculation of the electrical code, which has its own demand factors and its rules for the continuous loads, nor the study of the motor starting, of the voltage drop in the long cables or of the protection and the grounding. The installation of the temporary power must be made by a qualified electrician.