Bridge expansion joint movement calculator: how far does a bridge deck move?

Enter the deck length, the material, the temperature range, the shrinkage and creep strain and the safety factor to get the thermal movement, the shrinkage movement, the total and the design movement of the joint.

Updated on
Your inputs
ft

Value out of range

°F

Value out of range

με

Value out of range

Value out of range

Results

Design movement of the joint

3.74 in

2 to 5 in: strip seal or finger joint
Thermal movement
2.16 in
Shrinkage and creep movement
0.72 in
Total movement
2.88 in

The bridge expansion joint movement calculator gives the movement that an expansion joint must allow from the length of the deck, the material, the temperature range and the shrinkage and creep strain, with the design movement and the type of joint that it calls for.

How the calculation works

  • Enter the length of the deck that moves toward the joint, measured from the fixed point (the pier or abutment that holds the deck) to the joint.
  • Choose the material of the superstructure and enter the design temperature range, from the lowest to the highest temperature of the deck.
  • Enter the shrinkage and creep strain for a concrete deck (for steel, 0) and a factor for the construction tolerance.
  • The calculator finds the thermal movement, the shrinkage and creep movement, the total and the design movement of the joint.

Example

A concrete deck of 300 ft moves toward a joint, with a temperature range of 100 °F. The thermal movement is 6.0 × 10⁻⁶ × 300 × 12 × 100 = 2.16 in. A shrinkage and creep strain of 200 με adds 0.0002 × 300 × 12 = 0.72 in, for a total of 2.88 in. With a factor of 1.3 the design movement of the joint is 3.74 in, which calls for a strip seal or a finger joint.

Why it matters

The calculator helps bridge engineers, civil designers, inspectors and students to estimate the movement of a joint in a first design, to choose between a compression seal, a strip seal, a finger joint or a modular joint and to see the effect of the length of the deck. It shows why long bridges are divided into several spans with joints.

Good to know

Use the temperature range of the bridge code for the location and the type of bridge, and the shrinkage and creep from the structural analysis. Set the joint opening for the temperature at the time of installation. Provide drainage under the joint, and inspect it regularly, because the failed joints are a major cause of the damage of the bearings and the piers.

The pipe expansion loop calculator covers the thermal expansion of pipes, the thermal expansion calculator gives the change of length of any bar, the slab joint spacing calculator covers the joints of the slabs and the prestressed beam stress calculator covers the prestressed girders.

Frequently asked questions

Why do bridges need expansion joints?

A bridge deck expands and contracts with the temperature, and a concrete deck also shortens with the shrinkage and the creep, and with the prestress. If these movements are not allowed, large forces build up in the deck, the bearings and the piers. The expansion joints let the deck move and keep a smooth surface for the traffic, and they must also keep the water and the deicing salts out of the structure below.

How is the thermal movement found?

The thermal movement is the coefficient of thermal expansion α multiplied by the length and the range of temperature: ΔL = α L ΔT. The coefficient is about 6.0 × 10⁻⁶ per °F (10.8 × 10⁻⁶ per °C) for concrete and 6.5 × 10⁻⁶ per °F (11.7 × 10⁻⁶ per °C) for steel. The temperature range depends on the climate and on the type of bridge, as given in the bridge code, for example AASHTO.

What is the effect of shrinkage and creep?

A concrete deck shortens during the first years after the construction, because of the shrinkage of the concrete and, for a prestressed deck, the creep under the prestress. This shortening can be 0.0002 to 0.0006 of the length for a prestressed girder bridge. It adds to the contraction of the cold weather, so it is added to the movement of the joint on the contraction side.

What are the limits of the calculator?

The calculator gives the movement of the deck for a uniform temperature change. It does not include the effect of the temperature at the time of the installation of the joint, the rotation of the girders, the skew of the bridge, the seismic displacements, the braking forces, or the stiffness of the piers. The design of a joint follows the bridge code and the data of the manufacturer, and must be made by a bridge engineer.

Was this calculator helpful?

Thanks for your feedback!

Results are estimates provided for information purposes. They do not replace professional advice.