Skip to content
Omnikalc

Concrete mix temperature and ice replacement calculator

Enter the weights and the temperatures of the cement, the aggregates and the water, and the target temperature to get the mix temperature and the ice needed.

Updated on
Your inputs
lb/yd³

Value out of range

lb/yd³

Value out of range

lb/yd³

Value out of range

lb/yd³

Value out of range

°F

Value out of range

°F

Value out of range

°F

Value out of range

°F

Value out of range

Results

Ice needed to reach the target

44.3 lb/yd³

Concrete temperature without ice
87.4 °F
Part of the mixing water replaced by ice
15.8 %
Within the usual range
Concrete temperature with the ice
80.0 °F

The concrete mix temperature and ice replacement calculator gives the temperature of the fresh concrete, the weight of ice needed to reach a target, its share of the mixing water and the final temperature, from the weights and the temperatures of the cement, the aggregates and the water.

How the calculation works

  • Enter the weights of the cement, the dry aggregates, the mixing water and the free moisture of the aggregates, per cubic yard.
  • Enter the temperatures of the aggregates, the cement and the water, and the target temperature of the concrete.
  • The calculator finds the temperature without ice, the ice needed, its share of the mixing water and the final temperature.

Example

A mix of 564 lb of cement, 3,000 lb of aggregates, 280 lb of water and 60 lb of free moisture, with the aggregates at 90 °F, the cement at 100 °F and the water at 75 °F, has a temperature of 98,208 / 1,124.08 = 87.4 °F. To reach 80 °F it needs (98,208 − 80 × 1,124.08) / (75 + 112) = 44.3 lb of ice per cubic yard, that is 15.8 percent of the water, and the temperature of the concrete is then 80.0 °F.

Why it matters

The calculator helps concrete producers, quality managers, contractors, engineers and inspectors to plan the cooling of concrete in hot weather, to find how much ice replaces the mixing water, and to check that a mix will meet the limit of temperature at the time of placing.

Good to know

Replace the water by ice flakes or crushed ice and not by blocks, and keep the ice in an insulated bin until the batching. Keep the aggregate piles in the shade and sprinkle them with cool water, since the aggregates have the largest effect on the temperature of the mix. Measure the temperature of the first loads, and write the weight of ice on the batch ticket.

The concrete evaporation rate calculator gives the rate of drying of the surface in hot weather, the mass concrete temperature rise calculator gives the heat of hydration of a thick pour, the cold weather concrete heat loss calculator gives the heat needed in the cold and the concrete curing calculator gives the time of curing.

Frequently asked questions

How is the temperature of the fresh concrete computed?

The temperature of the mix is a weighted average of the temperatures of its parts, using their heat capacity. Cement and aggregates have a specific heat of about 0.22 compared with 1.0 for water, so a pound of water counts about 4.5 times as much as a pound of cement. The free moisture on the aggregates counts as water at the temperature of the aggregates. The formula comes from the guide ACI 305 for hot weather concreting.

How does ice cool the concrete?

Ice absorbs 144 Btu per pound when it melts, a heat that comes from the other parts of the mix and lowers their temperature. A pound of ice lowers the temperature of the mix by much more than a pound of cold water. The ice must melt before the end of mixing, so it is used as flakes or crushed ice, and the water replaced by ice should not exceed about 75 percent of the mixing water.

What temperature should the concrete have?

Many specifications limit the temperature of the concrete at the time of the placing to 90 or 95 °F, and some ask for less, such as 80 °F for mass concrete or for a high strength mix. A hot concrete loses its slump faster, sets quicker, needs more water for the same workability and may crack from plastic shrinkage. Cooling the concrete is one of the main measures of hot weather concreting.

What does the calculator leave out?

The calculator gives the temperature at the end of the mixing and does not include the heat gained from the sun during the haul or the heat of the mixer and of the truck. It does not size the cooling of the aggregates with chilled water or with liquid nitrogen. Check the temperature of a trial batch, and adjust the ice with the readings you take at the plant.

Was this calculator helpful?

Thanks for your feedback!

Results are estimates provided for information purposes. They do not replace professional advice.