Change of the paste volume against 100 % cement

6.25 %

Portland cement
451.2 lb/yd³
Supplementary cementitious material
112.8 lb/yd³
Absolute volume of the cementitious material
3.05 ft³/yd³
Portland cement for the job
33.84 tons
SCM for the job
8.46 tons

The fly ash and slag cement replacement calculator gives the portland cement and the SCM per cubic yard, the absolute volume of the cementitious material, the change of the paste volume and the tons for the job of a concrete mix, from the cementitious content and the replacement percentage.

How the calculation works

  • Enter the total cementitious content of the mix, the replacement percentage by weight and the specific gravity of the SCM.
  • Enter the volume of concrete of the job.
  • The calculator finds the portland cement and the SCM per cubic yard, the absolute volume, the change of the paste volume and the tons for the job.

Example

A mix has 564 lb/yd³ of cementitious material with 20 % of fly ash of specific gravity 2.4. The portland cement is 564 × 0.80 = 451.2 lb/yd³ and the fly ash is 112.8 lb/yd³. Their absolute volume is 451.2 / 196.56 + 112.8 / 149.76 = 3.05 ft³/yd³, against 2.87 ft³ for 100 % cement, so the paste volume increases by 6.25 %. For 150 yd³, the job needs 33.84 tons of cement and 8.46 tons of fly ash.

Why it matters

The calculator helps concrete producers, mix designers, engineers and students to turn a replacement percentage into weights, to see how the lighter SCMs change the paste volume of a mix, and to find the tons of cement and of SCM to order for a pour.

Good to know

Make the replacement from the weight of the total cementitious material, and correct the volume of the aggregates for the larger paste volume. Check the setting time and the early strength with trial batches, extend the curing when a high replacement is used, and watch the air content, since the carbon in some fly ashes takes the air-entraining agent.

The water cement ratio calculator gives the strength and the durability, the concrete batch yield absolute volume calculator checks the yield of a mix, the mass concrete temperature calculator shows the effect of the SCMs on the heat and the concrete volume calculator gives the quantity of concrete.

Frequently asked questions

What is a supplementary cementitious material?

A supplementary cementitious material, or SCM, is a material such as fly ash, slag cement, silica fume or natural pozzolan, which is used in concrete with the portland cement, or in place of a part of it. It improves the durability, reduces the heat of hydration and the permeability, and often lowers the cost and the carbon footprint of the concrete. The SCMs are usually specified as a percentage of the total cementitious material.

Why is the paste volume changed?

The replacement is made by weight, but the SCMs have a specific gravity lower than the portland cement, which is about 3.15. For the same weight, a fly ash of 2.4 takes more volume than the cement. The mix therefore has a larger paste volume, and the volume of the aggregates must be reduced to keep the yield of one cubic yard. This is checked with the absolute volume method.

What replacement percentages are usual?

A usual replacement is from 15 to 25 % for fly ash, from 25 to 50 % for slag cement, and from 5 to 10 % for silica fume. A higher replacement is used in mass concrete to limit the heat, and a lower one is used when an early strength is needed or in cold weather. The limits come from the specification, the exposure of the concrete and the tests of the mix.

What are the limits of the calculator?

The calculator makes the weights and the absolute volume of the cementitious part of the mix. It does not design the whole mix, which needs the water, the aggregates and the air, and it does not predict the strength, the setting time or the durability. The SCMs change the early strength, the setting time and the air entrainment, so that the mix must be proven with trial batches and with the tests of the specification.

Was this calculator helpful?

Thanks for your feedback!

Results are estimates provided for information purposes. They do not replace professional advice.