Skip to content
Omnikalc

Geogrid roll calculator: strips, area and rolls for a road base

Enter the road length and width, the roll size, the overlap and the allowance to get the strips, the area placed, the coverage factor and the number of rolls to order.

Updated on
Your inputs
ft

Value out of range

ft

Value out of range

ft

Value out of range

ft

Value out of range

ft

Value out of range

%

Value out of range

Results

Rolls to order

26

Strips across the width
3
Road area
6,667 yd²
Geogrid placed with the overlaps
8,667 yd²
Coverage factor
1.30

The geogrid roll calculator gives the strips across the width, the area of geogrid placed, the coverage factor and the number of rolls to order for the reinforcement of a road base or a platform, from the size of the area, the roll size and the overlap.

How the calculation works

  • Enter the length and the width of the road to reinforce.
  • Enter the width and the length of a geogrid roll, the overlap between the rolls and the allowance.
  • The calculator finds the strips across the width, the area placed, the coverage factor and the rolls to order.

Example

A road 2,000 ft long and 30 ft wide is covered with rolls 13 ft wide and 250 ft long, with an overlap of 1 ft. The strips across the width are ceil((30 − 1) / (13 − 1)) = 3. The road area is 6,667 yd² and the geogrid placed is 3 × 2,000 × 13 / 9 = 8,667 yd², a coverage factor of 1.30. With a 5 % allowance, the length of the strips is 6,000 × 1.05 = 6,300 ft, which makes 6,300 / 250 = 25.2, so 26 rolls.

Why it matters

The calculator helps road designers, earthwork contractors, estimators and students to order the right number of rolls of geogrid for a road or a working platform, to see how the overlap and the width of the roll change the area bought, and to compare the cost of the reinforcement with a thicker base.

Good to know

Place the geogrid on a smooth and firm subgrade, remove the sharp stones, pull it tight and anchor it with pins before the aggregate is spread. Spread the aggregate from the end of the rolls, do not drive on the bare geogrid, and keep the overlap shown on the drawings. Check that the first lift of aggregate has the thickness needed to protect the grid from the traffic.

The MSE wall reinforcement tension calculator checks the reinforcement of a retaining wall, the geotextile filter calculator checks the fabric of a drain, the compaction roller production calculator plans the compaction of the base and the soil compaction calculator checks the density of the fill.

Frequently asked questions

What is a geogrid?

A geogrid is a flat grid of polymer, with open apertures, used in the base of a road or under a platform to reinforce the soil or the aggregate. The stones lock in the apertures of the grid, which restrains the lateral movement of the base, increases the stiffness of the layer and allows a thinner base or a longer life for the same thickness. It is often placed on a weak subgrade.

How are the strips counted?

The rolls are laid across the width of the road, side by side, and each strip overlaps the next one. Each strip adds its width minus the overlap to the coverage, so that the number of strips is the width to cover minus one overlap, divided by the width of the roll minus the overlap, rounded up. Each strip runs along the full length of the road, with end overlaps at the joints between two rolls.

Why add an allowance?

The rolls are not cut at the exact length. The ends of two rolls in the same strip must overlap, the roll must be pulled tight and anchored, and the ends and the corners are cut and lost. An allowance of 5 % is common, and it is higher for a short or an irregular site. The calculator adds the allowance to the length of the strips before the division by the length of a roll.

What are the limits of the calculator?

The calculator gives the quantity of rolls for a rectangular area, with the overlap that you enter. It does not choose the type or the strength of the geogrid, which depends on the subgrade and the design, nor the thickness of the base. The overlap depends on the subgrade, the specification and the manufacturer, and is often longer, from 1 to 3 ft, on a weak soil. It does not include the pins, the anchors or the waste of a curved road.

Was this calculator helpful?

Thanks for your feedback!

Results are estimates provided for information purposes. They do not replace professional advice.