Pile cap strut-and-tie tie force calculator

Enter the column load, the number and the spacing of the piles, the column width and the depth of the cap to get the load on each pile, the tie force, the tie steel and the strut slope.

Updated on
Your inputs
kips

Value out of range

in

Value out of range

in

Value out of range

in

Value out of range

ksi

Value out of range

kips

Value out of range

Results

Tie steel required

1.70 in²

Load on each pile
125.0 kips
Tie force
76.4 kips
Number of tie bars
3
Strut slope z / run
1.64
The strut is at least 25 degrees from the tie
Pile load ratio
0.83
The piles can carry the load

The pile cap calculator uses the strut-and-tie model to give the load on each pile, the force in the tie and the tie steel of a cap on two or four piles, with the slope of the strut as a check of the geometry.

How the calculation works

  • Enter the factored column load, the number of piles (2 or 4), the pile spacing and the column width.
  • Enter the effective depth of the cap, the steel strength and the capacity of one pile.
  • The calculator gives the load on each pile, the force in the tie, the tie steel and the bar count, with the slope of the strut.

Example

A column carries 500 kips (factored) onto a square cap of 4 piles at 42 in spacing. The column is 18 in wide and the cap has d = 30 in, so the lever arm is z = 0.9 × 30 = 27 in. Each pile takes 500 / 4 = 125 kips, 83 percent of its 150-kip capacity. In the truss model the strut runs from a quarter of the column width to the pile, a horizontal run of 21 − 4.5 = 16.5 in, so its slope is 1.64. The force in each tie is 500 × (2 × 42 − 18) / (16 × 27) = 76.4 kips. With φ = 0.75 and Grade 60 steel, the area is 1.70 in², or 3 No. 8 bars in each tie.

Why it matters

The calculator helps foundation designers, structural engineers and students to size the bottom steel of a pile cap and to see how the spacing, the depth and the column width change the tie force. The truss model is quick, easy to check by hand and accepted by the codes for deep members.

Good to know

Use the factored load of the column for the tie and the same load, divided by the piles, against the factored pile capacity. Include the self weight of the cap. A deeper cap lowers the tie force and steepens the strut, but it costs concrete, so try two or three depths. For a two-pile cap, the tie runs between the piles only, and a stirrup cage must carry the shear in the other direction. Keep the clear cover at 3 in against the ground, as it is cast against soil.

The pile group efficiency calculator gives the capacity of the group, the pile capacity calculator gives the capacity of one pile in clay, the strut-and-tie deep beam calculator handles a deep beam with the same model and the rebar development length calculator gives the anchorage of the tie bars.

Frequently asked questions

How does the strut-and-tie model work for a pile cap?

The cap is a deep member, so plane sections do not stay plane. The load goes from the column to the piles along concrete struts, and the piles are tied together by the steel at the bottom. For two piles, the tie force is T = P (2 s − c) / (8 z), where s is the spacing, c the column width and z the lever arm. For a square cap of four piles, each of the four ties carries P (2 s − c) / (16 z).

What lever arm and angle should I use?

The calculator takes z as 0.9 d, which is a common approximation for a deep cap. The strut should not be flatter than about 25 degrees from the tie, or the struts and the nodes become too highly stressed, and the model loses accuracy. The calculator shows the slope z over the horizontal run as a check, with 0.47 as the limit for 25 degrees. If you fall below it, a deeper cap is the usual answer.

Where must the tie bars be placed and anchored?

The bars go in bands over the piles, with the largest share directly above each pile, and they must reach the full tie force at the inner face of the piles. The anchorage runs past the piles to the end of the cap and usually ends with a hook or a bend. Add side and top steel to control cracking. The calculator gives the bar count for the tie, not the layout.

What does the calculator leave out?

The calculator leaves out the self weight of the cap, the moment from the column, the shear and punching checks of the cap, the strength of the struts and nodes, the pile tolerances and the case of three, five or more piles. It takes equal pile loads. Add the weight of the cap to the column load, and check the strut and the nodes with the code before building.