Enter the jacking force, the anchor plate, the depth of the member, the yield strength and the tie area to get the bursting force, the spalling force, the steel and the number of ties.

Updated on
Your inputs
kip

Value out of range

in

Value out of range

in

Value out of range

ksi

Value out of range

in²

Value out of range

Results

Steel required for the bursting

2.24 in²

Bursting force
80.7 kip
Spalling force
8.8 kip
Number of ties
6
Length of the bursting zone
30 in

The post-tensioning anchorage zone bursting force calculator gives the bursting force, the spalling force, the steel required for the bursting, the number of ties and the length of the bursting zone behind a post-tensioning anchor, from the jacking force, the plate and the depth of the member.

How the calculation works

  • Enter the jacking force of the anchor, the dimension of the anchor plate and the depth of the member.
  • Enter the yield strength and the area of one tie.
  • The calculator finds the bursting force, the spalling force, the steel required and the number of ties.

Example

An anchor with a jacking force of 440 kip has a plate of 8 in in a member 30 in deep. The bursting force is 0.25 × 440 × (1 − 8 / 30) = 80.7 kip, and the spalling force is 0.02 × 440 = 8.8 kip. At a stress of 0.6 × 60 = 36 ksi, the bursting needs 2.24 in² of steel, that is 6 ties of 0.40 in², spread over a length of about 30 in.

Why it matters

The calculator helps bridge and building engineers, precast designers, post-tensioning contractors and students to estimate the reinforcement of the anchorage zone, to see how the size of the plate changes the bursting, and to check a design before the detailed analysis.

Good to know

Place the ties and the spirals of the anchorage zone before the pour with the tolerances of the drawings, and check that the concrete is well consolidated behind the anchors. Do not stress the tendons before the concrete has the strength required by the supplier of the anchors. Inspect the zone for cracks during and after the stressing.

The tendon friction loss calculator gives the loss along a post-tensioned tendon, the prestressed beam stress calculator gives the stresses of the section, the rebar development length calculator gives the anchorage of the bars and the anchor bolt pullout calculator checks an anchor in concrete.

Frequently asked questions

What is the anchorage zone?

The anchorage zone is the part of a post-tensioned member next to the anchor, where the concentrated force of the tendon spreads over the full section. The length of the zone is about the depth of the member. In this zone, the stresses are not linear, and the concrete is under transverse tension that can crack it. The zone needs a special reinforcement of ties or spirals.

What are the bursting and the spalling forces?

The bursting force is the tension across the member at some distance behind the anchor, where the compression path spreads out like the lines of the force in a wedge. The spalling force is a smaller tension near the loaded face, between and around the anchors. The calculator uses the simple formula of the AASHTO: bursting is 0.25 times the force times (1 minus the plate width divided by the depth), and the spalling is 2 % of the force.

How is the reinforcement found?

The area of the ties is the bursting force divided by an allowable steel stress, taken here as 0.6 times the yield strength to limit the crack width. The ties are spread on the length of the bursting zone, with more near the anchor. The area of the spalling reinforcement is added near the face, and the local zone under the plate is confined by the spiral or the ties of the manufacturer of the anchor.

What are the limits of the calculator?

The calculator uses an approximate formula for one anchor of a concentric force. It does not take into account the groups of the anchors, the eccentric forces, the curved tendons, the local zone under the plate, the strut-and-tie model, the real stress of the ties or the tests of the system. The anchorage zone must be designed with the method of the standard and the data of the supplier.

Was this calculator helpful?