The helical pile calculator gives the ultimate capacity, the allowable capacity, the minimum installation torque for a design load and the load ratio of a helical pile, from the final installation torque and the torque correlation factor Kt.
How the calculation works
- Enter the final installation torque read on the torque indicator during the last feet of installation.
- Choose the torque correlation factor that matches the shaft of the pile, enter the factor of safety and the design load.
- The calculator finds the ultimate capacity, the allowable capacity, the minimum torque needed for the design load and the ratio of the load to the capacity.
Example
A helical pile with a square shaft (Kt = 10 ft⁻¹) is installed with a final torque of 6,000 ft-lb. The ultimate capacity is 10 × 6,000 = 60,000 lb, or 60.0 kip. With a factor of safety of 2, the allowable capacity is 30.0 kip. For a design load of 20 kip, the minimum torque is 2 × 20,000 / 10 = 4,000 ft-lb, and the ratio of the load to the allowable capacity is 0.67.
Why it matters
The calculator helps foundation contractors, geotechnical and structural engineers, inspectors and students to check each helical pile on site, to find the torque to reach before stopping the installation, and to compare the capacity with the load of a deck, a solar array or a retrofit.
Good to know
Read the torque in the last three diameters of the helix, with a calibrated indicator, and never use the peak value of a single reading. Verify that the pile reaches the design depth in the bearing stratum as well as the torque, and keep the records of every pile. Run a load test on one or two piles of the job to confirm the correlation factor and to get a more economical design when the number of piles is large.
Related tools
The pile capacity calculator uses the soil strength for driven piles, the drilled shaft capacity calculator gives the bored shafts, the soil unit weight calculator converts the soil data and the torque calculator helps to size the drive tool.