The motor grader blading production calculator gives the lanes of the blade across the width, the pass length, the grading time, the working days and the net area graded per hour, from the blade length, the speed, the number of passes and the efficiency.
How the calculation works
- Enter the effective blade length, the grading speed, the number of passes and the job efficiency.
- Enter the length and the width of the road to grade and the working hours per day.
- The calculator finds the lanes of the blade across the width, the pass length, the time, the days and the net area per hour.
Example
A grader has an effective blade of 10 ft and works at 3 mph with an efficiency of 0.75. A road 2 mi long and 24 ft wide needs ceil(24 / 10) = 3 lanes, and with 4 passes the grader travels 2 × 4 × 3 = 24 mi. At 3 × 0.75 = 2.25 mi/h, this takes 24 / 2.25 = 10.7 h, or 1.33 days of 8 h. The net area graded is 3 × 5,280 × 0.75 × 10 / 4 = 29,700 ft²/h.
Why it matters
The calculator helps earthwork contractors, road crews, estimators and students to plan the time of a grader on a road or a pad, to compare several numbers of passes or speeds, and to see how the width of the work changes the number of lanes and the time.
Good to know
Use the effective blade length after the overlap, and take the speed of the real passes, not the speed of the machine in the transport. Keep the passes straight and long to reduce the time lost in the turns, and add the passes of the final trim if the tolerance is tight. Check the grade with a string or with the machine control, and add a margin on the time for the wet weather.
Related tools
The dozer production blade calculator gives the production of a dozer, the compaction roller production calculator sizes the compaction behind the grader, the earthwork swell and shrink calculator gives the volume of the earth and the soil compaction calculator checks the density of the fill.