The silt fence quantity calculator gives the number of posts, the length of fabric, the number of rolls and the volume of the anchor trench of a sediment control fence, from the length, the post spacing and the allowance.
How the calculation works
- Enter the length of the silt fence and choose the post spacing.
- Enter the length of a fabric roll, the waste and overlap allowance and the size of the anchor trench.
- The calculator finds the number of posts, the fabric to buy, the number of rolls and the volume of the anchor trench.
Example
A silt fence 1,200 ft long with posts every 6 ft needs 1,200 / 6 + 1 = 201 posts. With a 5 % allowance, the fabric is 1,200 × 1.05 = 1,260 ft, which makes 13 rolls of 100 ft. The anchor trench is 6 in wide and 6 in deep, so the volume to dig is 1,200 × 0.5 × 0.5 / 27 = 11.1 yd³.
Why it matters
The calculator helps site managers, erosion control contractors, inspectors and students to order the posts and the rolls of fabric for a stormwater plan, to estimate the trenching, and to compare the quantities of several layouts or spacings before the start of the earthwork.
Good to know
Place the fence along the contour, not across the slope, with the ends turned up the slope so that the water cannot flow around it. Bury the bottom of the fabric in the trench and compact the backfill on the upslope side. Inspect the fence after each rain, remove the sediment when it reaches half the height, and repair the tears at once. Keep a few spare posts and a short roll of fabric on site for the repairs.
Related tools
The infiltration trench calculator sizes a trench for the runoff, the earthwork swell and shrink calculator gives the volume of soil to handle, the trench dewatering calculator pumps the water of an excavation and the geotextile filter calculator checks the fabric of a drain.