Concrete saw cut joint calculator: layout, length, depth and time

Enter the slab size, the thickness, the joint spacing, the cut depth and the sawing speed to get the spacing ratio, the number of joints, the saw cut length, the depth and the time.

Updated on
Your inputs
ft

Value out of range

ft

Value out of range

in

Value out of range

ft

Value out of range

ft/h

Value out of range

Results

Sawing time

4.4 h

Ratio of the spacing to the thickness
24.0
The spacing is within the usual rule
Number of joints
12
Total saw cut length
880 ft
Depth of the saw cut
1.5 in

The concrete saw cut joint calculator gives the ratio of the joint spacing to the thickness, the number of joints, the total saw cut length, the depth of the cut and the sawing time for a concrete slab, from its size, its thickness and the joint spacing.

How the calculation works

  • Enter the length, the width and the thickness of the slab, and the joint spacing.
  • Choose the depth of the saw cut and enter the sawing speed.
  • The calculator finds the ratio of the spacing to the thickness, the number of joints, the total saw cut length, the depth and the sawing time.

Example

A slab 100 ft long and 60 ft wide is 6 in thick, with joints every 12 ft, a ratio of 12 × 12 / 6 = 24.0. It has ceil(100 / 12) − 1 = 8 joints across the width of 60 ft and ceil(60 / 12) − 1 = 4 joints along the length of 100 ft, that is 12 joints and 8 × 60 + 4 × 100 = 880 ft of saw cut. The depth is 1/4 of 6 in, or 1.5 in, and at 200 ft/h the sawing takes 4.4 h.

Why it matters

The calculator helps concrete contractors, floor designers, estimators and students to check the spacing of the control joints of a slab, to estimate the length to saw and the time of the saw crew, and to see how the joint spacing changes the number of joints and the cost of the sawing and sealing.

Good to know

Cut the joints as soon as the concrete can bear the saw without raveling, usually 4 to 12 hours after the finishing, and cut all the joints before the slab cracks. Keep the panels square or with a ratio of the sides lower than 1.5, and extend the joints to the columns and the re-entrant corners. Seal the joints later, when most of the shrinkage has occurred.

The slab joint spacing calculator gives the maximum spacing from the rules of the practice, the joint sealant movement and width calculator sizes the sealant, the concrete crack width calculator checks the cracks of a reinforced member and the concrete evaporation rate calculator warns of the plastic cracking in the hot and windy weather.

Frequently asked questions

Why are the joints of a slab sawn?

Concrete shrinks as it dries and cools, and a slab that is held by the ground cracks when the tensile stress is more than its strength. The saw cuts make a weak line, so that the slab cracks at the bottom of the cut, in a straight line that is easy to seal, and not at random. The joints must be cut as soon as the concrete is hard enough not to ravel, and before the shrinkage stress becomes too high.

What is the rule for the joint spacing?

A common rule is to keep the joint spacing, in feet, at 2 to 3 times the slab thickness in inches, which is a ratio of 24 to 36 between the spacing and the thickness in the same unit. For a 6 in slab, that gives a spacing from 12 to 18 ft. A tighter spacing is better for a slab with a high shrinkage, with a thin section or without a good subgrade, and the panels should be as square as possible.

What depth must the saw cut have?

The saw cut must go through about a quarter of the slab thickness for a conventional saw, so that the weak line is enough to control the crack. An early-entry saw makes a shallower cut, from 1 to 1 1/4 in, cut soon after the finishing, and it is used for the slabs thicker than 8 in or when the cut must be made early. For a slab with a stabilized base, one third of the thickness is recommended.

What are the limits of the calculator?

The calculator gives the layout of the joints in a rectangle and the length to saw, with a constant sawing speed. It does not give the best time to cut, which depends on the temperature, the mix and the maturity of the concrete, the isolation joints around the columns and the walls, or the shape of the panels. The joint layout must be shown on the drawings and approved by the engineer.