Time rate of consolidation calculator: how long a clay layer takes to consolidate (Terzaghi)

Enter the clay thickness, the drainage conditions, the coefficient of consolidation, the target degree and an elapsed time to get the time factor, the time to reach the target and the degree of consolidation reached.

Updated on
Your inputs
ft

Value out of range

ft²/day

Value out of range

%

Value out of range

days

Value out of range

Results

Time to reach the target degree

212.0 days

Time factor Tv for the target degree
0.848
Time to reach the target degree, in years
0.58 years
Time to reach 50% consolidation
49.1 days
Degree of consolidation after the elapsed time
86.3 %

The time rate of consolidation calculator gives the time needed for a saturated clay layer to reach a degree of consolidation, from its thickness, its drainage conditions and the coefficient of consolidation, with the time factor of Terzaghi, and the degree reached after a given time.

How the calculation works

  • Enter the thickness of the clay layer and the drainage conditions: single if the water can leave from one face only, double if it can leave from the top and the bottom.
  • Enter the coefficient of consolidation cv from the oedometer test.
  • Enter the target degree of consolidation, for example 90%, and an elapsed time to check.
  • The calculator finds the time factor Tv and the time t = Tv H² / cv, with H the longest drainage path, and the degree reached after the elapsed time.

Example

A clay layer 20 ft thick has sand above and below (double drainage), so the drainage path is 10 ft, and cv = 0.4 ft²/day. For 90% consolidation, Tv = −0.933 log(1 − 0.9) − 0.085 = 0.848, and the time is 0.848 × 10² / 0.4 = 212 days, or 0.58 years. Half of the consolidation takes 0.19635 × 100 / 0.4 = 49.1 days. After 180 days, Tv = 0.4 × 180 / 100 = 0.72 and the degree of consolidation is 86.3%.

Why it matters

The calculator helps geotechnical engineers, contractors and students to estimate how long a fill or a building will settle on clay, to plan a preloading period and to compare the effect of vertical drains. It complements the consolidation settlement calculator, which gives the total amount and not the time.

Good to know

Use the cv from the oedometer tests for the stress range of the project, and consider the variation of the drainage path with layers of sand or silt within the clay, which can make the real drainage faster. Check the settlement against the construction schedule. Monitor the settlement in the field with plates and piezometers, and update the estimate with the measurements.

The consolidation settlement calculator gives the total settlement, the elastic settlement calculator covers immediate settlement, the soil unit weight calculator converts the soil weights and the piping safety factor calculator checks seepage.

Frequently asked questions

What is the time factor?

The dimensionless time factor Tv = cv t / H² in Terzaghi’s theory of one-dimensional consolidation relates the time t to the coefficient of consolidation cv and to the longest drainage path H. A given degree of consolidation always corresponds to the same Tv, whatever the layer, so the time scales with the square of the drainage path. Doubling the path increases the time by four.

How is the drainage path found?

If the clay is between two permeable layers such as sand or gravel, the water leaves from the top and the bottom, and the drainage path is half of the thickness. If one face is impervious, such as rock or a dense clay, the water leaves from only one face and the path is the full thickness. Because the time depends on the path squared, the type of drainage makes a four-fold difference.

How is the degree of consolidation computed?

The average degree of consolidation U is related to the time factor by U = √(4 Tv / π) for U up to 60%, and by Tv = −0.933 log(1 − U) − 0.085 above. These are the standard approximations to the exact series solution. At U = 90% the time factor is 0.848, and 0.197 at 50%. The calculator also finds U from the elapsed time with the same equations.

Can the time be shortened?

Yes. Because the consolidation is slow in thick clays, vertical drains, such as prefabricated strip drains or sand drains, reduce the drainage path to half the drain spacing, and the consolidation takes weeks and not years. A surcharge or preloading accelerates the settlement by increasing the load. The cv comes from the oedometer test, and it varies with the stress level, so a range of values should be considered.

Was this calculator helpful?

Thanks for your feedback!

Results are estimates provided for information purposes. They do not replace professional advice.